z-logo
open-access-imgOpen Access
Diagnosing High Water Production in Kalama Field, Niger Delta
Author(s) -
A. Joseph,
Friday James
Publication year - 2021
Publication title -
journal of engineering research and reports
Language(s) - English
Resource type - Journals
ISSN - 2582-2926
DOI - 10.9734/jerr/2021/v21i917488
Subject(s) - casing , environmental science , petroleum engineering , water cut , oil field , water injection (oil production) , niger delta , oil production , workover , produced water , irrigation , production (economics) , environmental engineering , waste management , geology , delta , engineering , ecology , macroeconomics , aerospace engineering , economics , biology
Produced water is water trapped in underground formations that is brought to the surface along with oil or gas. It is by far the largest volume by-product or waste stream associated with oil and gas production especially in brown fields. Management of produced water present challenges and costs to operations. In this paper, the possible causes, effects and solutions of high water-cut is being investigated in some production oil wells in Niger Delta, using Kalama field as a case study. Diagnostic and performance plots were developed in order to determine the source of water as well as to evaluate the impact of excess water production on oil production and in field economics in general. Results obtained from the diagnostic plots showed the possible sources of water production are channeling behind casing and multi-layered channeling. The recommended remediation is cementation through a workover operation. Also, a concise step to be taken for identifying excess water was also developed in this work to effectively control excess water production in oil producing wells.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here