z-logo
open-access-imgOpen Access
PERENCANAAN PROYEK PEMBANGUNAN GEDUNG PERPUSTAKAAN UNIVERSITAS ISLAM INTERNASIONAL INDONESIA DEPOK
Author(s) -
Agung Samudra,
Suhariyanto,
Susapto
Publication year - 2021
Publication title -
jurnal online skripsi manajemen rekayasa konstruksi
Language(s) - English
Resource type - Journals
ISSN - 2722-9203
DOI - 10.55404/jos-mrk.2021.02.03.256-260
Subject(s) - plan (archaeology) , schedule , project planning , transport engineering , indonesian , project management , scheduling (production processes) , work breakdown structure , operations management , engineering , organizational structure , work (physics) , engineering management , operations research , computer science , project charter , management , geography , systems engineering , mechanical engineering , linguistics , philosophy , archaeology , economics , operating system
The Indonesian International Islamic University Depok Library Building Construction Project has area of 16495 m2. This library has 8 floors, which is located in the middle of the city. So, the mobilization of tools and materials become easier. The purpose of this study is to make project planning in terms of organizational structure, site layout, traffic management, strategy and implementation methods, quality, safety, occupational health and environment (K3L); Project Implementation Budget Plan and project scheduling. The data used are shop drawings, Work Plan and Conditions, and HSD Depok City 2020. Planning a project schedule using the Barchart method with the help of MS. Project 2016. This planning produces a line type organizational structure where the leaders and subordinates are in one line of command; Site Layout by using 1 unit tower crane; Traffic Management planning using a one gate system; The implementation strategy uses 2 zones; The implementation method uses Bottom Up, starting from zone 1 then proceed to zone 2 until the 8th floor; Quality plan based on the application of SOP (Standard Operating Procedure); The HSE plan includes hazard identification, an HSE equipment plan, and an HSE implementation schedule; The project duration plan is 43 weeks, and the Implementation Budget Plan is Rp. 151,141,347,875.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here