z-logo
open-access-imgOpen Access
STUDI EVALUASI DAN RENOVASI SISTEM PENTANAHAN DI SEKOLAH MENENGAH KEJURUAN (SMK) NEGERI 1 CIMAHI
Author(s) -
Sunarto Sunarto,
Toto Tohir,
Robert Adriaan Philipus,
Yudi Prana Hikmat,
Trisnawiyana Trisnawiyana,
Yoseph Santosa
Publication year - 2021
Publication title -
madani : jurnal pengabdian kepada masyarakat/madani : jurnal pengabdian kepada masyarakat
Language(s) - English
Resource type - Journals
eISSN - 2723-5335
pISSN - 2442-5931
DOI - 10.53834/mdn.v7i1.3029
Subject(s) - ground , ohm , earthing system , engineering , electrical engineering
This research is a follow-up to the findings of the inspection and grounding testing in PKM 2018 activities. The value obtained exceeds 5 ohms. This is not according to the standards based on the General Requirements for Electrical Installation (PUIL) 2011. In the 2019 PKM program activities, evaluation and renovation studies of the installed earthing system which includes: surveying the location to be grounded, drilling for the position of the electrodes to be installed, installation of electrodes equipped with Bentonic material which functions as a binder so that the electrodes with the ground become one and strong, measurement of the earthing value, perform grounding installation, re-measurement of earthing. The earthing value obtained is much smaller than the previous measurement results of 2.83 ohms in the Electronics Laboratory and 2.72 Ohms at the Automation Laboratory of SMKN 1 Cimahi. It is according to the recommended standard PUIL 2011. The PKM team proposes the management of SMKN 1 Cimahi to carry out a routine maintenance and measurement process twice a year on the newly installed earthing system so that the earthing value remains according to the standard.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here