z-logo
open-access-imgOpen Access
Effects of Shaft Grouting on the Bearing Behavior of Barrette Piles: A Case Study in Ho Chi Minh City
Author(s) -
Phu-Cuong Nguyen,
Phu Cuong Nguyen
Publication year - 2021
Publication title -
engineering, technology and applied science research/engineering, technology and applied science research
Language(s) - English
Resource type - Journals
eISSN - 2241-4487
pISSN - 1792-8036
DOI - 10.48084/etasr.4389
Subject(s) - ho chi minh , pile , geotechnical engineering , bearing (navigation) , foundation (evidence) , geology , head (geology) , bearing capacity , finite element method , structural engineering , engineering , computer science , archaeology , physics , geography , quantum mechanics , scale (ratio) , geomorphology , artificial intelligence
The shaft-grouted method has been applied on high-rise buildings in Ho Chi Minh City for the purpose of increasing the bearing capacity of barrette piles. The Exim Bank Building foundation, using two kinds of shaft-grouted barrette piles, was 65m (TP1) and 85m (TP2) in depth. To assess the bearing capacity, this project assembly used the O-cell tools installed at 49m depth below the pile head level. Shaft grouting was performed from -25m to the TP1 pile toe level and -65m to the TP2 pile toe level. This work is based on the data from the O-cell experiments at the construction site and the results of finite element simulation in Plaxis software. The effectiveness of shaft grouting was analyzed and the length and position of the ejector were evaluated and compared in order to find the best solution for applying shaft grouting with the aim to ensure safety and mitigate economic problems.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here