z-logo
open-access-imgOpen Access
Optimal Management for Waters for the Production of Electrical Energy
Author(s) -
Amina Bensalem,
A Oudai,
Ali Elmaouhab,
Abdelmalik Bouhentala
Publication year - 2015
Publication title -
revue des sciences fondamentales et appliquées
Language(s) - English
Resource type - Journals
ISSN - 1112-9867
DOI - 10.4314/jfas.v2i1.5
Subject(s) - lagrange multiplier , mathematical optimization , maximization , hydropower , time horizon , hydroelectricity , augmented lagrangian method , computer science , mathematics , engineering , electrical engineering

The hydropower management along a short-term planning horizon is a determinist problem, which consists in determining the amount of water to be discharged from each reservoir of the system over the defined planning horizon so that to meet the hourly load demand assigned previously. The prime objective here is to perform the operating policy with the lowest use of water; which is achieved by avoiding spilling and by maximizing the hydroelectric generation, besides satisfying all operating constraints. The maximization of electrical power production is achieved by maximizing the heads. Consequently, this allows maximizing the reservoirs content.

To solve to the deterministic hydropower management problem, we use the discrete maximum principle. While solving the equations relating to the discrete maximum principle, we use the gradient method. However, to treat equality constraints we use Lagrange’s multiplier method. To treat the inequalities constraints we use the augmented Lagrangian method. The developed algorithm gives a satisfactory solution for the problem and turns out to be very efficient.