z-logo
open-access-imgOpen Access
Kicks Controlling Techniques Efficiency in Term of Time
Author(s) -
Ali K. Darwesh,
Thorkild Maack Rasmussen,
Nadhir AlAnsari
Publication year - 2017
Publication title -
engineering
Language(s) - English
Resource type - Journals
eISSN - 1947-3931
pISSN - 1947-394X
DOI - 10.4236/eng.2017.95028
Subject(s) - casing , petroleum engineering , well control , drilling fluid , drilling , completion (oil and gas wells) , process (computing) , underbalanced drilling , lost circulation , point (geometry) , oil well , margin (machine learning) , term (time) , engineering , computer science , geology , mechanical engineering , mathematics , geometry , machine learning , operating system , physics , quantum mechanics
Kicks are the result of under balance drilling operation. Time consumed to control the kicks will be different in depending on the controlling technique. Drilling fluid considered as a first barrier to control formation pressure and well kicks. Any advance in drilling fluids leads to more controlled operation in term of time. This paper will follow the general increasing profile of pressure before entering the reservoir. Both methods of well controlling technique; circulating techniques and non-circulating have been implemented in many oil blocks. The process of designing and casing selection, setting depth and many other issues is predominately dependent on the utilization of accurate values of formation pressure. Formation pressures used to design safe mud weights to overcome fracturing the formation and prevent well kicks. Hence the emphasis has been placed on the practical utilization of kicks pressure near the reservoir. The presented relationships will help the engineer to better understand lithological columns and reduce potential hole problems during the kick appearance. Selecting the best well controlling practical method can lead to not harming the reservoir and more production later. Changes in some drilling fluid properties have been proposed with increasing the depth without damaging the reservoir. Suggestions in relation to the casing setting point of the intermediate section are also proposed. Standard equations with proper modification for gases and safety margin have been proposed for the future drilling operation in oil fields above the reservoir.

Validerad;2017;Nivå 1;2017-05-31 (rokbeg)

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here