z-logo
open-access-imgOpen Access
On 7,000 m Sea Trials of the Manned Submersible Jiaolong
Author(s) -
Weicheng Cui,
Feng Liu,
Zhen Hu,
Zhu Min,
Wei Guo,
Chenggang Liu
Publication year - 2013
Publication title -
marine technology society journal/marine technology society journal
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.23
H-Index - 43
eISSN - 1948-1209
pISSN - 0025-3324
DOI - 10.4031/mtsj.47.1.2
Subject(s) - troubleshooting , sea trial , aeronautics , marine engineering , meteorology , environmental science , computer science , oceanography , engineering , operations research , geology , geography , reliability engineering
Development of the deep manned submersible Jiaolong was one of the key projects of the National 863 high-tech program. The program’s target was to build a practical product to carry out a set of predefined missions. The 7,000 m sea trial was the last stage of the development process, a final phase that incorporated higher risks. During the preceding periods from August 6 to October 20, 2009, May 31 to July 18, 2010, and July 1 to August 18, 2011, the 1,000, 3,000, and 5,000 m depth class tests were successfully completed. The main purpose of this paper is to introduce the results of the 7,000 m depth class test, which was conducted from June 3 to July 16, 2012. The paper describes the general sea trial procedures, and technological and scientific achievements realized during the tests, main faults experienced in the field, along with corresponding troubleshooting methods and suggestions for future application of the Jiaolong submersible. In addition, several conclusions are drawn from all the experiences gained from these sea trials.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here