z-logo
open-access-imgOpen Access
PERENCANAAN PEMELIHARAAN MOTOR DIESEL DENGAN METODE RCM (RELIABILITY CENTERED MAINTENANCE) PADA PLTG TELUK LEMBU PEKANBARU
Author(s) -
Darno
Publication year - 2020
Publication title -
jurnal surya teknika
Language(s) - English
Resource type - Journals
eISSN - 2723-7222
pISSN - 2354-6751
DOI - 10.37859/jst.v7i1.2353
Subject(s) - mean time between failures , reliability engineering , reliability (semiconductor) , downtime , automotive engineering , engineering , diesel generator , unavailability , duration (music) , diesel fuel , power (physics) , failure rate , physics , quantum mechanics , art , literature
Teluk Lembu Gas Power Plant (PLTG) is one type of power plant that uses the power of burning fuel and high pressure air. To be able to meet the needs of electrical energy on the island of Sumatra, especially in the Riau region,electricity production must not experience a decrease in productivity due to equipment damage. Obstacles that arise are frequent downtime unexpectedresulting in  the production  of electricity is  interrupted or  even  to  cause derating caused by damage to the operational when the engine is running. This study aims to provide recommendations  for  equipment  maintenance  andtime  intervals  optimal  inspectionin  the generator system. The research method used is Reliability Centered Maintenance (RCM) withanalysis  quantitative.  Where  are  the  stages  of  implementing the  RCM  method,  namely determining thecomponents criticalin the PLTG generator engine, determining thevalues, determining the Mean Time to Failure (MTTF) and Mean Time to Repair (MTTR)time interval optimal maintenance,  and making a table of  causes of damage to  thecomponents  generator engine. After analyzing it, it was found that thecomponent criticalof PLTG Teluk Lembu is the Diesel Motor. This is obtained based on the component with the highest frequency of damage, namely 13 damage during a period of 1 year. From the results of data processing, it is obtained that the MTTF value is 0.92441 hours and the MTTR value is 0.89014 hours. Theinspection time interval optimalis 25 days, so it is advisable to carry out Corrective and Preventive maintenance activities for Diesel Motorcycles periodically every 25 days (PM 25D) in order to increase the reliability of the Diesel Motor

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here