z-logo
open-access-imgOpen Access
Simulation for Solving Bottom-neck Problem in Light-soaked Divider Mechanic production line
Author(s) -
C Srisuwannapa
Publication year - 2021
Publication title -
international journal of engineering sciences
Language(s) - English
Resource type - Journals
ISSN - 0976-6693
DOI - 10.36224/ijes.140201
Subject(s) - production (economics) , computer science , completion (oil and gas wells) , production line , software , simulation , industrial engineering , real time computing , operations research , operations management , engineering , operating system , mechanical engineering , economics , macroeconomics
The research objective is to find better solutions to solve problem of bottom-neck in production line of light-soaked Divider Mechanic of case study company producing promotional labels, price tag, floor sticker, Stand-up signage for indoor and outdoor use with a comprehensive printing style using system simulation with Arena software. The results were as follows. In case of production of 25 pieces/day, the best way to improve system efficiency is Scenario 4, reducing the completion time of the system of down to 23.12%, and Scenario 3, reducing the system time of down to 22.91% consecutively. In case of production of 50 pieces/day, the best way to improve system efficiency is Scenario 3, reducing the system completion time of down to 23.39% and then Scenario 4, reducing the completion time of the system of down to 22.57% consecutively. In case of production of 100 pieces/day, the best way to improve system efficiency is Scenario 3, reducing the system completion time of down to 24.03%. and then Scenario 4, reducing the completion time of the system of down to 23.03% consecutively.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom