
To Interpret Rate Transient Analysis for the Determination of Reservoir Properties
Author(s) -
Nitesh Paliwal,
Prathamesh Sapale,
Vishesh Bhadariya,
Shreeharsha Vandavasi
Publication year - 2019
Publication title -
international journal of recent technology and engineering
Language(s) - English
Resource type - Journals
ISSN - 2277-3878
DOI - 10.35940/ijrte.d7636.118419
Subject(s) - dimensionless quantity , mathematics , flow (mathematics) , period (music) , exponential function , mechanics , statistics , mathematical analysis , geometry , physics , acoustics
Rate-time decline curve analysis is a major technique which is mostly used in petroleum engineering. Many methods are used for the determination of the decrease in the production rate within a given period of time. The main disadvantage of Arp’s decline type curve analysis is that it is only used for boundary dominated flow period; it is not used for transient flow period. The analysis of the Fetkovich is to determine the log-log type curve for both the transient flow period (early time period or infinite) and boundary-dominated flow period (late time period). Arps developed the type curve which shows the production rate decline with time for the finite reservoir or late time period. The exponential or constant flow decline, hyperbolic decline, and harmonic decline according to the value of decline curve exponent (b) is given by Arps. After that Fetkovich improved on earlier work done by Arps in predicting decline production rate of wells over a given period of time. The main objective of this study was to plotting the rate transient analysis curve. I will plot the Fetkovich type curve (combined early and late times region). The graph will be plotted between the dimensionless decline flow rate (qDd) and the dimensionless decline time” (tDd). This will be the objective of the study.