z-logo
open-access-imgOpen Access
Hydropower Potential of Agricultural Dam in Bukit Merah
Author(s) -
E. Roslan,
Sulaiman Shaari,
Faiz Zamri,
Afifi Akhiar,
Faridah Hani Mohamed Salleh,
Zakwan Ramli,
Abd Halim Shamsuddin
Publication year - 2019
Publication title -
international journal of recent technology and engineering
Language(s) - English
Resource type - Journals
ISSN - 2277-3878
DOI - 10.35940/ijrte.d5114.118419
Subject(s) - hydropower , irrigation , turbine , hydroelectricity , environmental science , small hydro , hydrology (agriculture) , drainage , electricity generation , nameplate capacity , water resource management , environmental engineering , engineering , power (physics) , geotechnical engineering , mechanical engineering , ecology , physics , quantum mechanics , biology , electrical engineering
Malaysia, although having a good number of small to medium hydro power potential sites, has still not exploited all of them. The focus of this manuscript is a feasibility study of the technical viability of power generation from a medium hydropower potential site, the Bukit Merah Dam site, on the Terusan Besar irrigation canal in northern region of Malaysia. This study is carried out using flow data of 2016 from the main irrigation canal of Bukit Merah dam. The data was obtained from Department of Irrigation and Drainage, Perak. The power capacity, yearly energy output of the potential hydro site are studied in this work. Technical analysis of the power output capacity and yearly energy output of three (3) hydro-turbine types (Kaplan, Propeller, and Francis) operable at the same given head and design flow were studied. The study shows that there is a potential capacity of 2.2 MW and an annual energy generation capacity of 7028.47 MWh at a turbine peak efficiency of 92.8% at a design flow of 19.23 m3/s using Kaplan turbine.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here