z-logo
open-access-imgOpen Access
Time and Resource Management of Residential Apartment Construction using Building Information Modeling
Author(s) -
Gaurav S. Narlawar,
N. B. Chaphalkar,
Sayali Sandbhor
Publication year - 2019
Publication title -
international journal of innovative technology and exploring engineering
Language(s) - English
Resource type - Journals
ISSN - 2278-3075
DOI - 10.35940/ijitee.j9951.0881019
Subject(s) - building information modeling , facility management , schedule , rework , apartment , computer science , dimension (graph theory) , construction engineering , systems engineering , resource (disambiguation) , construction management , project management , information model , architectural engineering , engineering , software engineering , civil engineering , scheduling (production processes) , operations management , computer network , mathematics , marketing , pure mathematics , business , embedded system , operating system
To complete a project under the complicated situations, it is important to follow effective ways to use available tools and methods, taking into account present technology and management. Also, it is challenging to prepare accurate and achievable plans in large construction projects. Visualizing forms at an early stage in building design improves the ability of designers to deliver ideas and the capability to inspect and assess the methods helps to predict and optimize the actual presentation of the construction project. These different features form the basis for Building Information Modeling (BIM). The archetypal problems like budget overflow, lack of communication, cost overruns, overtime delays, rework can be minimized with the use of Building Information Modeling (BIM) tools for building design & resource management. In this paper, the concept of Building Information Modelling (BIM) is used for 3D modeling, which involves 4th dimension as Time (4D), 5th dimension of Cost (5D) of the project. A case study of G+5 residential apartment is presented for 3D BIM modeling and quantity take-off with the commercial software Autodesk Revit 2019. The 4D BIM carried out using Primavera P6 is explained with methodology for a case study. Further, Autodesk Navisworks Manage 2019 is used for 5D BIM, which includes a graphical presentation of the construction schedule and cost estimation of the case study.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here