
Historical crane on the redesigned original trestle bridge as a memorial of Gdansk Shipyard
Author(s) -
Jacek Chróścielewski,
Mikołaj Miśkiewicz,
Łukasz Pyrzowski
Publication year - 2013
Publication title -
budownictwo i architektura
Language(s) - English
Resource type - Journals
eISSN - 1899-0665
pISSN - 2544-3275
DOI - 10.35784/bud-arch.2039
Subject(s) - bridge (graph theory) , scope (computer science) , shipyard , current (fluid) , presentation (obstetrics) , engineering , finite element method , research object , object (grammar) , scheme (mathematics) , civil engineering , computer science , construction engineering , structural engineering , shipbuilding , archaeology , geography , programming language , mathematics , artificial intelligence , medicine , mathematical analysis , regional science , electrical engineering , radiology
The paper includes selected aspects of the study, whose goal is to hold the historical crane 642-24 in its current location after the modification of trestle bridge static scheme. The scope of the paper includes the assessment of current technical condition of the object, a presentation of FEM analyses, a description of the assumed load cases, results of the static calculations, checking the effort of construction elements, global and local structure stability and its dynamic characteristics.