z-logo
open-access-imgOpen Access
PERANCANGAN ULANG TATA LETAK FASILITAS DENGAN MENGGUNAKAN METODE KONVENSIONAL BERBASIS 5S
Author(s) -
Panca Wahyu Utari,
Yetti Meuthia Hasibuan,
Rini Halila Nasution
Publication year - 2020
Publication title -
jitekh (jurnal ilmiah teknologi harapan)/ji tekh : jurnal ilmiah teknologi harapan
Language(s) - English
Resource type - Journals
eISSN - 2549-6646
pISSN - 2338-5677
DOI - 10.35447/jitekh.v8i2.350
Subject(s) - factory (object oriented programming) , manufacturing engineering , computer science , product (mathematics) , production (economics) , engineering drawing , database , engineering , mathematics , geometry , economics , macroeconomics , programming language
The facility layout design greatly affects the performance of a company. Poor facility layout will lead to poor material flow patterns and relatively high movement of materials, products, information, equipment and labor which causes delays in product completion and increases production costs. Facility layout design aims to analyze improvements in production activities. In preparing the layout of the facility, this research applies the 5S method to see what needs to be improved and to redesign the factory layout. The object of this research was conducted at PT. XYZ. The results showed that the redesign of the facility layout of the light bulb processing factory of PT.XYZ consists of several parts that must be improved in order to obtain the best final layout. The redesign of this facility layout does not have to require additional areas, this can be done by rearranging it. Based on the trial questionnaire before applyingthe 5S method,it was found that seiri,seiso,seiton,seiketsu,shitsuke needed improvement, while after redesigning using 5S method, it was found that only seiketsu and shitsuke needed improvement.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here