z-logo
open-access-imgOpen Access
Implementación de la metodología RCM en máquina plisadora
Author(s) -
Alberto Tudón-Martínez,
Marco Antonio Zúñiga-Martínez,
Miguel Angel Lerma-García,
Luis Alberto Méndez-Govea
Publication year - 2019
Publication title -
revista de análisis cuantitativo y estadístico
Language(s) - English
Resource type - Journals
ISSN - 2410-3438
DOI - 10.35429/jqsa.2019.19.6.13.15
Subject(s) - downtime , mean time between failures , automotive industry , reliability (semiconductor) , production (economics) , overall equipment effectiveness , computer science , reliability engineering , manufacturing engineering , operations management , engineering , failure rate , power (physics) , physics , quantum mechanics , economics , macroeconomics , aerospace engineering
The objective of this project is to reduce the downtime of a machine that performs the pleating of materials in a company dedicated to the manufacture of automotive parts. The development of this project aims to increase the availability of the machine and contribute to the use of material and humnan resources, achieving an increase in production to ensure permanence and competitiveness in the Market. Reliability Centered Maintenance (RCM) will be the methodology used to achieve the goal. The implementation of this methodology contributes to the updating of maintenance programs to achieve an increase of the MTBF indicator (Average Time Between Failures) and the decrease of the MTTR (Mean Time to Repair). The application of maintenance methodologies that exist today plays an important role within the industrial sector when it is necessary to meet the goals set by companies to meet the needs of customers.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here