z-logo
open-access-imgOpen Access
Perencanaan Ulang Pondasi Pilar Jembatan Sikabu Kayu Gadang
Author(s) -
Chairi Ozi
Publication year - 2021
Publication title -
civil engineering collaboration
Language(s) - English
Resource type - Journals
ISSN - 2615-5915
DOI - 10.35134/jcivil.v6i2.30
Subject(s) - precast concrete , pile , foundation (evidence) , bearing capacity , bridge (graph theory) , structural engineering , engineering , geotechnical engineering , medicine , archaeology , history
The construction of transportation facilities such as bridges plays an important role in the development of human resources today because more and more road users will use these facilities. The Sikabu Kayu Gadang Bridge has a span of 100 meters with a structure of precast concrete, abutments, pillars and a foundation of concrete and steel piles which inspired the authors to conduct research. In this type of selection, several things need to be considered, such as the load being carried and the location of the hard ground. Based on this, this study aims to analyze the deep foundation that can be applied to the project in the hope of getting more efficient results. Based on the re-planning, the bearing capacity of the foundation permit (Qall) is 1254.98 kN with a diameter of 0.5 m and a depth of 20 m. The permitted bearing capacity of the pile group (Qall) is 12795.46 kN to withstand the loads acting on the superstructure. Bore Pile foundation logitudinal reinforcement = 10 D16 and Bore Pile shear reinforcement = ᴓ 12 – 150 mm.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here