
Study of the risk of scheme of traffic light as risk technical system with the fault tree method
Author(s) -
Tsvetelina Simeonova
Publication year - 2019
Publication title -
godišnik telekomunikacii/godišnik na departament telekomunikacii
Language(s) - English
Resource type - Journals
eISSN - 2534-854X
pISSN - 2367-5039
DOI - 10.33919/ytelecomm.19.6.3
Subject(s) - fault tree analysis , risk management , scheme (mathematics) , risk analysis (engineering) , computer science , tree (set theory) , risk assessment , fault (geology) , sample (material) , reliability engineering , data mining , engineering , mathematics , computer security , business , mathematical analysis , chemistry , finance , chromatography , seismology , geology
The aim of the paper is to develop a methodology for risk analysis and risk assessment of a risk technical system (traffic light scheme) using the fault tree method. Results: Analysis of the risk of risk technical systems through a fault tree gives an unambiguous relationship between element parameters and parameters of equivalent elements describing a system or a part of a system. An example of risk analysis of a risk technical system (traffic light-scheme) is shown with the fault tree method applicable to students training on risk analysis and management, including a sample scheme and a tree scheme (according to accepted assumptions) and with the possibility of calculating it and determining the risk at the assumed value of the damage. Contributions: A methodology for analysis and risk assessment of risk technical systems (traffic lightscheme) has been developed and an example has been developed for the students' training in risk analysis and management.