PERENCANAAN PELEBARAN APRON BANDAR UDARA DENGAN METODE FEDERAL AVIATION ADMINISTRATION (FAA) (Studi Kasus Pelebaran Apron Bandar Udara Abdul Rachman Shaleh Malang)
Author(s) -
Marjono Helmi Hermawan
Publication year - 2014
Publication title -
prokons /prokons
Language(s) - English
Resource type - Journals
eISSN - 2714-8815
pISSN - 1978-1784
DOI - 10.33795/prokons.v8i2.73
Subject(s) - aviation , aeronautics , transport engineering , engineering , aerospace engineering
Current conditions of available capacities at Abdul Rachman Saleh Airport Malang  can only accomodate four planes. The increasing number of aircraft departures and arrivals at The airport by 4.7 percent per year, requires accordance with the requirements. Due to the increasing numbers of departure and arrival, apron enlargement design for the next five year was made using FAA method. The objective of the study is to find out the area of the apron enlargement, pavement depth including the time and cost. CBR data were obtained from Polytechnic soil laboratory, arrival, departure and layout data were from Department of Transportation Malang. From data obtained  FAA method is used to determine the enlargement and pavement depth . The calculations result in 11,253 m2 apron enlargement at a depth of 24 cm at IDR 4,897,100,000 in 133 work days.Keywords: enlargement apron, apron pavement, FAA

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here