
PERENCANAAN INSTALASI PENGOLAHAN AIR LIMBAH (IPAL) KOMUNAL CLUSTER RIVERPLACE PERUMAHAN TIRTASANI KABUPATEN MALANG
Author(s) -
M.Si Dra. Utami Retno Pudjowati,
Muhamad Zenurianto
Publication year - 2019
Publication title -
prokons /prokons
Language(s) - English
Resource type - Journals
eISSN - 2714-8815
pISSN - 1978-1784
DOI - 10.33795/prokons.v13i2.212
Subject(s) - wastewater , sewage treatment , environmental science , estate , unit (ring theory) , environmental engineering , waste management , engineering , business , mathematics , mathematics education , finance
Tirtasani Estate doesn’t have communal wastewater treatment which makes the water polluted. To solve those problems, the writer intended to design wastewater treatment plant. This thesis aimed to (1) find the waswater discharge (2) design the wastewater treatment plant (WWTP) system (3) estimate the cost of WWTP manufacturing.The data needed for this design were the map of the housing, Tirtasani estate’s topographic map, Work Unit Price of Malang District 2018. The data were obtained from site surveys.The design resulted in (1) 85.6 m3 / day wastwater discharge (2) wastewater discharge made into f 4” wastewater pipe; 3 unit of 30 m3 WWTP tank with Anaerobic aerobic system ; 3.25 m x 9.5 m x 3.5 m WWTP structure. Keywords: communal, design, WWTP