IMPLEMENTING A SYSTEMATIC APPROACH TOWARDS THE DOWNTIME COST
Author(s) -
Bhushan B. Malusare,
Hemant Salunkhe
Publication year - 2019
Publication title -
international journal of engineering applied science and technology
Language(s) - English
Resource type - Journals
ISSN - 2455-2143
DOI - 10.33564/ijeast.2019.v03i12.005
Subject(s) - downtime , computer science , risk analysis (engineering) , reliability engineering , business , engineering
The purpose of this paper is to present a sample of how Indian manufacturing companies deal with equipment downtime cost, and further how they analyze its reduction. The study was performed by conducting a web-based survey within Indian firms that have at least 50 employees. The main results obtained from the investigation show that the estimated downtime costs constitute about 23.00 – 30.00 % from the total manufacturing cost ratio, and 13.00 – 15.00 % from planned production time. Additionally, the hourly cost of downtime, whether planned or unplanned, is relatively high. However, there is a shortage of systematic models that are capable to trace the individual cost imposed by downtime events. This lack was shown apparently whilst 83 % of surveyed companies they do not have any complete model adapted for quantifying their downtime costs. Moreover, only few companies develop their cost accounting methods such as, activity-based costing (ABC) and resource consumption accounting (RCA) to assimilate and reveal the real costs that associated with planned and unplanned stoppages. Still, the general pattern of downtime cost calculation allocated to direct labour and lost capacity cost. On the other hand, the attempts of decreasing downtime events and thus costs were based on schedule maintenance tactics that supported by overall equipment effectiveness (OEE) tool, as an indicator for affirming improvements. Nonetheless, the analysis indicates the need for optimized maintenance tactics by incorporating reliability-centered maintenance (RCM) and total productive maintenance (TPM) into companies’ maintenance systems. Furthermore, the same analysis shows the requirement for better results of performance measurement systems is by implementing total equipment effectiveness performance tool (TEEP). The advantage of such tool is to provide the impact index of planned stoppages in equipment utilization factor. Finally, the lack of fully integrated models for assessing the downtime costs and frameworks for distinguishing the difference between planned and unplanned stoppages are the main reasons behind the continuation of cost in ascending form. Due to that, the improvements will emphasize on areas with less cost saving opportunities. As a result, this will affect the production efficiency and effectiveness which in return has its influence on costs and thereby profits margin. Further, I have worked on a model which will divide the resources into small activities which will help us to recognise the defects (planned/unplanned) into various categories and suggest the same to different companies in the nearby vicinity.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here