z-logo
open-access-imgOpen Access
Analisis Beban Listrik Saat Operasi Penangkapan Ikan Pada KM. Sumber Natuna
Author(s) -
Mardiyono Mardiyono
Publication year - 2020
Publication title -
energi and kelistrikan/energi dan kelistrikan
Language(s) - English
Resource type - Journals
eISSN - 2655-5042
pISSN - 1979-0783
DOI - 10.33322/energi.v12i1.892
Subject(s) - electric power , generator (circuit theory) , watt , work (physics) , electric generator , electrical engineering , electrical load , automotive engineering , power (physics) , engineering , environmental science , electric motor , marine engineering , voltage , mechanical engineering , physics , quantum mechanics
The use of electric load in km. Sumber Natuna against capacity generators on every operation condition good day as well as night is different – different. The results of usage of electric load at km. Sumber Natuna include lighting, installation of aircraft electrical and motor-electric motor, with the overall power of 187.567 Watt. Maximum electric load usage at night that is at the time of the arrest operation in Fishing Ground of 169,521 Watt with power effectiveness of 84.7% and during the day on the way back towards the harbour i.e. of 126,232 Watt with power effectiveness of 63.1%. The maintenance activity performed often plying consists of: an examination of the State of the generator visually, cleaning the outside of the generator, checks on excessive heat on the generator. To keep the generators as power plants on board can work optimally and not much experience constraints, then the generator must be supported by the activities of care of components that work well and planned.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here