z-logo
open-access-imgOpen Access
Determination of Employee Productivity : A Case Study At PT. Reliance Sekuritas Indonesia, Tbk Bandung Branch and Tasikmalaya
Author(s) -
Tine Badriatin,
Rudy Setiawan,
Lucky Radi Rinandiyana
Publication year - 2019
Publication title -
international journal of advances in social and economics
Language(s) - English
Resource type - Journals
ISSN - 2685-2691
DOI - 10.33122/ijase.v2i2.96
Subject(s) - incentive , productivity , data collection , documentation , work (physics) , test (biology) , regression analysis , work productivity , business , incentive program , operations management , statistics , computer science , economics , engineering , mathematics , economic growth , mechanical engineering , paleontology , programming language , biology , microeconomics
This study aims to determine whether there is an influence with the implementation of the provision of incentive programs to increase employee work productivity at PT. Reliance Sekuritas Indonesia, Tbk Bandung Branch - Tasikmalaya, totaling 23 employees. This study used quantitative research methods using surveys of employees with data collection techniques using interviews and questionnaires as well as with documentation studies, where all employees were sampled in data collection. Meanwhile in analyzing the data in this study using regression and hypothesis testing where the results of the hypothesis test on the incentive program variables have significant results on the work productivity of PT. Reliance Sekuritas Indonesia, Tbk Bandung Branch - Tasikmalaya. The results of this study were calculated using microsoft excell 2007 and SPSS 24 which shows that the influence between the incentive system variables on work productivity by the remaining 55.20% is 44.80% influenced by factors other than the incentive system that are not examined.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here