
Analisa Kinerja Angkutan Umum Penumpang Perkotaan Ditinjau Dari Tingkat Pelayanan di Kota Tuban
Author(s) -
Andi Syaiful Amal,
Shaufi Kholif Arfintana,
Khoirul Abadi
Publication year - 2021
Publication title -
jurnal ilmiah universitas batanghari jambi
Language(s) - English
Resource type - Journals
eISSN - 2549-4236
pISSN - 1411-8939
DOI - 10.33087/jiubj.v21i2.1388
Subject(s) - headway , public transport , trips architecture , transport engineering , productivity , travel time , business , engineering , economics , macroeconomics
Passenger public transportation in Tuban is one of the means of transport used by the community to meet the transport needs. Total fleet of public transport passengers registered and active operating as many as 40 vehicles, consisting of 30 units of passenger public transportation route A and 10 units of passenger public transportation route B, with a capacity of 12 passengers/vehicle. Passenger public transportation operates from 06.00 - 17.00 with the number of trips ranging from 7-8 trips/day every vehicle and can carry 9-10 passengers/trip every vehicle. The waiting time of passenger route A average of 3 minutes, and route B average of 9 minutes. The purpose of research is to determine the performance and productivity of the passenger public transportation of Tuban. The research using empirical methods to obtain information from observations in the field and these observations are presented in the form of data.The research results it is known that the performance and productivity of public transportation on route A and B. Route A has an average load factor of 81,39%, an average frequency of 20,97 vehicles/hour, an average headway of 2.88 minutes, an average travel time of 3,50 minutes/km, an average travel speed of 21,52 km/hour, and a productivity 7,62 trips/day-vehicle, with 74,45 passengers/day-vehicle. Route B has an average load factor of 78,19%, an average frequency of 7,15 vehicles/hour, an average headway of 8,93 minutes, an average travel time of 2,39 minutes/km, an average travel speed of 21,78 km/hour, and a productivity 7,74 trips/day-vehicle, with 72,6 passengers/day-vehicle..