
Analisis dan Identifikasi Sisa Material Konstruksi pada Pekerjaan Beton (Studi Kasus pada pekerjaan Pembangunan Pasar Rakyat Talang Banjar)
Author(s) -
Elvira Handayani,
Fenel Veronata
Publication year - 2019
Publication title -
jurnal ilmiah universitas batanghari jambi
Language(s) - English
Resource type - Journals
eISSN - 2549-4236
pISSN - 1411-8939
DOI - 10.33087/jiubj.v19i2.684
Subject(s) - residual , mathematics , algorithm
In the implementation of a building construction project, it cannot be avoided the emergence of the remaining construction material or called construction waste. The rest of the material is something that is of the nature more than what is required either in the form of work or construction material that is left / scattered / damaged so that it cannot be used again according to its function. The amount of residual material can be minimized by exploring the factors that cause the residual material to occur and the use of a good management system. The more residual material found on the project, it can be interpreted that the smaller the profit from implementing the project.