
Challenges and their remedies while cementing production casing in high-temperature wells
Author(s) -
В. П. Овчинников,
П. В. Овчинников,
А. В. Мелехов,
О. В. Рожкова
Publication year - 2019
Publication title -
izvestiâ vysših učebnyh zavedenij. neftʹ i gaz
Language(s) - English
Resource type - Journals
ISSN - 0445-0108
DOI - 10.31660/0445-0108-2019-1-39-46
Subject(s) - casing , petroleum engineering , annulus (botany) , drilling , durability , corrosion , completion (oil and gas wells) , oil well , well drilling , fossil fuel , thickening , environmental science , geology , petroleum industry , geotechnical engineering , engineering , materials science , waste management , metallurgy , pulp and paper industry , mechanical engineering , environmental engineering , composite material
The development of the global oil industry is closely related to the exploration of new oil and gas fields through the drilling new deep and ultra-deep wells, as well as the application of modern methods of hydrocarbon production. Usage of new methods of production, increasing the depth of the wells, bottomhole temperatures and pressures sets strict requirements and restrictions for the applied plugging materials. Oil well cements must have a long time of thickening to successfully complete the cementing process, grouting stone must have high strength characteristics, heat-resistant properties at high temperatures and provide reliable isolation of the annulus, also have corrosion resistance, ensure durability of the well lining.