z-logo
open-access-imgOpen Access
PRIDICTION OF THE PRODUCTIVITY OF HYDRAULIC FRACTURED VERTICAL WELL WITH INFINITE CONDUCTIVITY FRACTURE
Author(s) -
S. A. Faiq,
А. В. Саранча
Publication year - 2017
Publication title -
izvestiâ vysših učebnyh zavedenij. neftʹ i gaz
Language(s) - English
Resource type - Journals
ISSN - 0445-0108
DOI - 10.31660/0445-0108-2017-5-96-99
Subject(s) - hydraulic fracturing , permeability (electromagnetism) , hydraulic conductivity , productivity , geotechnical engineering , petroleum engineering , geology , fracture (geology) , conductivity , penetration (warfare) , soil science , engineering , operations research , chemistry , genetics , macroeconomics , membrane , soil water , economics , biology
Hydraulic fracturing is used to significantly improve well productivity, particularly in reservoirs with low permeability. In carrying out this operation in the reservoir creates a large branched system of cracks. Increase filtration connection of the wells to remote areas. This article will present the results of numerical solution of the problem related to the definition of increasing the productivity of vertical wells after hydraulic fracturing, with infinite conductivity fracture. As a result, productivity index increases with penetration ratio distance for all aspect ratios.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here