z-logo
open-access-imgOpen Access
METHOD FOR RESERVOIR OIL RECOVERY IMPROVEMENT AT PLANNING THE FORMATION HYDRAULIC FRACTURING WITH USEOF A PACKER ASSEMBLY
Author(s) -
T. Yu. Yusifov,
S. G. Panyak,
A. A. Askerov,
A. Yu. Yusifov
Publication year - 2015
Publication title -
izvestiâ vysših učebnyh zavedenij. neftʹ i gaz
Language(s) - English
Resource type - Journals
ISSN - 0445-0108
DOI - 10.31660/0445-0108-2015-5-74-76
Subject(s) - petroleum engineering , hydraulic fracturing , wellbore , normalization (sociology) , geology , engineering , mining engineering , sociology , anthropology
The article describes the experience of FHF operations implementation in the fields of the company «RN-Purneftegas» using the packer assembly PC-168C manufactured by the product company «Packer Tools». A new approach to FHF conduction in wells is approved which is based on a temporal isolation of the horizontal hole by a packer assembly enabling to avoid performing additional normalization of the well bottom hole after hydraulic fracturing.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here