z-logo
open-access-imgOpen Access
Determination of optimal oil pumping plans
Author(s) -
Timur Bekibayev,
Gaukhar Ramazanova,
М. А. Пахомов,
D.Zh. Bosinov
Publication year - 2022
Publication title -
kompleksnoe ispolzovanie mineralnogo syra = complex use of mineral resources
Language(s) - English
Resource type - Journals
eISSN - 2616-6445
pISSN - 2224-5243
DOI - 10.31643/2022/6445.02
Subject(s) - pipeline transport , metering mode , petroleum engineering , pipeline (software) , volumetric flow rate , range (aeronautics) , environmental science , engineering , mechanical engineering , mechanics , physics , aerospace engineering
This paper presents the results of determining the optimal plans for pumping oil through the main oil pipelines of Kazakhstan. The calculation methodology is based on determining the minimum unit cost of pumping depending on oil flow rate. Oil pumping energy-saving modes are determined under optimal operating conditions of pumping units and heating furnaces at stations. Determination of the optimal pumping plan is implemented as a separate module of the SmartTranPro software. Pumped oil volumes on the oil pipeline sections were determined on the basis of the automated system of control and metering of electrical energy data of KazTransOil JSC. Optimal pumping plans for monthly oil volumes in the Kalamkas – Karazhanbas and Dzhumagaliev – Atasu pipeline sections for cold and warm periods were calculated on the basis of the found dependence of the pumping unit cost. For each range of oil mass flow rate, specific costs for oil pumping and a list of operating pumps at oil pumping stations located along the pipeline section are indicated.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom