z-logo
open-access-imgOpen Access
Evaluasi Water Shut Off Dan Membuka Lapisan Baru Sumur Bagong Di Lapangan Lesma
Author(s) -
Abdullah Rizky Agusman,
Aly Rasyid,
Dika Latief Lesmana
Publication year - 2022
Publication title -
jurnal bhara petro energi
Language(s) - English
Resource type - Journals
eISSN - 2828-5530
pISSN - 2828-3457
DOI - 10.31599/bpe.v1i1.1013
Subject(s) - shut down , closing (real estate) , environmental science , perforation , production (economics) , produced water , layer (electronics) , waste management , petroleum engineering , geology , environmental engineering , materials science , engineering , law , political science , process engineering , composite material , punching , economics , macroeconomics
Evaluation of Water Shut Off and Opening a New Layer of the Bagong Well in the Lesma Field, In oil and gas exploitation activities at the Bg01 Well, the well has been in production for a long time, so there is a problem where the proportion of water content in production wells continues to increase. compared to the proportion of oil and gas content produced, the improvement is carried out using the water shut off method by closing the existing perforation holes and opening new perforations in the same layer. Or closing the existing perforation holes that are indicated to cause an increase in water and the production of other perforated parts. By closing the layer, it is hoped that the water cut will decrease so that it will increase oil and gas production.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here