
CAUSES OF POOR QUALITY CASING OF DIRECTIONAL WELLS AT THE DRILLING DEPARTMENT «UKRBURGAZ» AND METODS FOR THEIR ELIMINATION
Author(s) -
І. М. Ковбасюк,
O. B. Martsynkiv,
B. O. Martsynkiv
Publication year - 2019
Publication title -
naftogazova energetika
Language(s) - English
Resource type - Journals
eISSN - 2415-3109
pISSN - 1993-9868
DOI - 10.31471/1993-9868-2019-1(31)-26-35
Subject(s) - casing , drilling , petroleum engineering , quality (philosophy) , geology , process (computing) , engineering , mining engineering , geotechnical engineering , computer science , mechanical engineering , physics , quantum mechanics , operating system
The analysis of modern studies and field data relating to directional wells casing at the enterprises of “Ukrburgas” drilling company has been carried out in the article. In particular, complications with casing strings, which happened when casing directional wells at these enterprises, data on the non-admission of casing strings to the total depth, a brief description of works aimed at restoring the quality of well casing, are considered. Main reasons of complications, damages and failures during well casing process have been determined. It has been found out that casing string failures mostly happened in the areas of intensive wellbore deviation. The reasons of directional wells poor quality casing taking into account the results of new theoretical, experimental and field research have been systemized. Cases of wells poor quality casing are supposed to be divided into two groups: 1) casing strings damage, 2) non-admission of casing strings to the total depth and violation of string integrity. Each of the groups is classified in accordance with the types of poor casing. The main reason of directional wells poor quality casing are failures caused by wrong casing strength calculations, violation of casing well technology, casing strings wear, mining and geological conditions. The non-admission of the columns to the total depth and poor-quality joining of sections are minor, which arise due to the low passability of the well, inaccurate determination of the depth of the well, geological conditions, etc. Measures to prevent complications, damages and accidents during well casing, in particular, work on forming the necessary wellbore profile, maintaining the design parameters of drilling fluid, and compliance with the requirements of enterprise standards during preparation works, lowering, cementing and final casing works have been worked out.