z-logo
open-access-imgOpen Access
Construction Cost for Soil Excavation (Cut and Fill) on-Site: Computer Based Program Analysis
Author(s) -
Anas Ahmed Abdelbagi Hamad,
AUTHOR_ID,
Azri Ikhwan Lokman,
Lim Qian Xi,
Mohammad Raziq Fakhrullah,
Nur Iffah Zaharin,
Prakash Krishnan,
Nur Atikah Kamil,
Ponselvi Jeevaragagam,
Faridahanim Ahmad,
AUTHOR_ID,
AUTHOR_ID,
AUTHOR_ID,
AUTHOR_ID,
AUTHOR_ID,
AUTHOR_ID,
AUTHOR_ID,
AUTHOR_ID
Publication year - 2021
Publication title -
journal of advanced industrial technology and application
Language(s) - English
Resource type - Journals
ISSN - 2716-7097
DOI - 10.30880/jaita.2021.02.02.010
Subject(s) - excavation , octave (electronics) , software , computer science , computer program , computation , process (computing) , coding (social sciences) , engineering , algorithm , mathematics , acoustics , programming language , geotechnical engineering , statistics , physics
Excavation is an important part of any construction project whereby removing earth to form cavity in the ground. This paper mainly focuses on cut and fill excavation by identify the cost of labor, material and equipment. Besides that, this paper aims to have better understanding on Bill of Quantity using coding. The method implemented for this study is using GNU Octave, version 6.2.0 and manual calculation to calculate the construction cost incurred during excavation process. Referring to the manual calculation, the overall cost obtained for the project is RM27352.15 whereas using GNU Octave software obtained for the project is RM27352.15. Thus, both GNU Octave software and manual calculation has zero percent difference. Octave is a computer programme that is designed for numerical computations and able to solve linear and nonlinear mathematical problems.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here