Time and Cost Planning of a Housing Construction Project Using Building Information Modelling
Author(s) -
Siddesh Pai,
Amit Shriwas
Publication year - 2020
Publication title -
journal of construction research
Language(s) - English
Resource type - Journals
ISSN - 2630-5089
DOI - 10.30564/jcr.v1i2.1155
Subject(s) - building information modeling , scheduling (production processes) , construction engineering , process (computing) , construction management , building construction , project planning , engineering , systems engineering , visualization , pre construction services , project management , transport engineering , computer science , civil engineering , operations management , mechanical engineering , structural engineering , operating system
Conventional ways of building construction process lack proper task scheduling and planning of the project work at the site resulting in poor monitoring of the whole process. Building information modelling (BIM) creates a platform where all the information of every single element of the construction process can be virtually integrated. The integration of 3D elements of a building model with its scheduled time and cost parameters results in 5D BIM. This feature enables the visualization, scheduling, planning, and monitoring and clash detection of all pre- construction, construction and post-construction processes of a building. The present study used the information of a live project of a traditionally built residential building which was remodelled using 5D BIM technique. The purpose of this study was to compare and analyse the impact of 5D BIM on time and cost parameters of the live project.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here