
Analysis Of Railroad Reactivation On Traffic In The Babat-Jombang Road
Author(s) -
Zoya Aurora Putri Sulaiman,
Sri Wiwoho Mudjanarko
Publication year - 2019
Publication title -
journal of world conference
Language(s) - English
Resource type - Journals
ISSN - 2656-1174
DOI - 10.29138/prd.v2i1.135
Subject(s) - queue , transport engineering , closing (real estate) , limit (mathematics) , value (mathematics) , mode (computer interface) , speed limit , computer science , automotive engineering , statistics , mathematics , business , engineering , computer network , finance , mathematical analysis , operating system
The train is a mode of transportation that has many advantages. Already the supposed superiority used optimally ensure the movement of people and goods, This study uses a quantitative research. The analyzes were performed using the method of shock waves, based on Level of Service (Los) the degree of saturation in the biggest roadway there on days 1 and 2 towards Jombang-Babat at 8:00 to 9:00 pm at 0:26 into the category B where the value is less than the limit traffic density (0.26 <1). In the segment occurs queue as far as 624 meters long with 85 queues of vehicles takes time for 300 seconds from the start of the closing latch until the vehicle can run normally.