Improving the manufacturability of the process of dismantling panel buildings, taking into account the tightness of the construction site
Author(s) -
Elena Korol,
Yuliya Gaydysheva
Publication year - 2021
Publication title -
stroitelʹstvo i arhitektura
Language(s) - English
Resource type - Journals
eISSN - 2500-1477
pISSN - 2308-0191
DOI - 10.29039/2308-0191-2021-9-1-21-25
Subject(s) - design for manufacturability , schedule , work (physics) , production (economics) , engineering , process (computing) , production schedule , manufacturing engineering , operations management , construction engineering , computer science , mechanical engineering , scheduling (production processes) , economics , macroeconomics , operating system
The article discusses the schedule for the production of dismantling works in normal and cramped conditions. The analysis of resources to reduce the production of work and ways to improve the manufacturability of the production of dismantling works. A combined method of work performance with the use of modernized construction equipment and an increase in output per unit of structure is considered.