z-logo
open-access-imgOpen Access
Implementasi Line Balancing untuk Peningkatan Efisiensi di Line Welding Studi Kasus: PT X
Author(s) -
Hery Hamdi Azwir,
Harry Wahyu Pratomo
Publication year - 2017
Publication title -
jurnal rekayasa sistem industri/jurnal rekayasa sistem industri
Language(s) - English
Resource type - Journals
eISSN - 2339-1499
pISSN - 0216-1036
DOI - 10.26593/jrsi.v6i1.2428.57-64
Subject(s) - idle , bottleneck , line (geometry) , production line , work (physics) , computer science , production (economics) , mathematics , engineering , economics , operating system , embedded system , mechanical engineering , geometry , macroeconomics
Line balancing is a jobs assignment into a number of work stations that are interrelated in a track or a production line with an objective to minimizing the idle time on the line that is determined by the slowest operation. In line welding 1DY models includes eight work stations where one work station is done by one operator. Problems have been found that these operators have very long idle time and also there is too much wip that creates bottleneck in the production line so these leads to a waste of manpower and time. This waste of manpower and time need to be reduced by determining the optimal amount of labor in order to avoid excessive idle time but work can be done effectively and efficiently. One way to adress imbalance line is to apply line balancing methods.The results of this research shows that the line balancing methods can reduced the waste of time and give solutions for the optimal amount of labor requirements for line welding 1DY models. Keywords: Line Balancing, Workstation, Production Line, Idle Time, Bottleneck.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here