Identifikasi Faktor-Faktor Yang Mempengaruhi Keterlambatan Proyek Infrastruktur Kereta Cepat Jakarta-Bandung
Author(s) -
Yurianto Yurianto,
Trihono Kadri
Publication year - 2020
Publication title -
indonesian journal of construction engineering and sustainable development
Language(s) - English
Resource type - Journals
ISSN - 2621-4164
DOI - 10.25105/cesd.v3i1.8022
Subject(s) - unavailability , transport engineering , analytic hierarchy process , work (physics) , computer science , operations management , business , operations research , engineering , reliability engineering , mechanical engineering
High speed trains are designed with a speed of more than 350 km/ hour. High speed trains in Indonesia were  built by PT Kereta Cepat Indonesia China (KCIC). The route served from Halim station in Jakarta to Tegal  Luar Sation, which is located in Bandung district, has a length of 142.3 km. The construction of the fast train  is divided into 4 (four) sections including sections 1, 2, 3 and 4. This fast train line consists of an elevated,  tunnel and subgrade. Some construction works often experience delays due to complexity, land availability,  design delays and availability of resources. Implementation time is an important factor in project management  besides cost and quality. There are several factors that hinder the completion of the Jakarta-Bandung fast train  project, so it is necessary to conduct a study on the inhibiting factors and solutions to minimize delays. The  research method used is AHP weighting analysis. Based on the analysis and discussion, it can be concluded  that from 61 potential aspects of the cause of the delay, there are 11 variables that affect the implementation time of the Jakarta-Bandung fast train infrastructure development project based on the AHP ranking, including  constraints in land acquisition for infrastructure buildings (63,144%), scheduling very strict projects by  owners (61,771%), work order plans that are not well structured / integrated (61,570%), unavailability  (materials, tools, labor) as needed (57,216%), shop drawings are not ready on time, no opportunity to learn  (56,266%), changes in design / work details during implementation (56,170%), quite complicated project  coordination (54,851%), negligence / delay by work sub contractors (53,081%), unclear technical  specifications and less firm because it is too general (52,837%), there is a development permit procedure that  is dip ery difficult for various parties (50,370%) and unfavorable weather conditions (49,680%)