MEMINIMASI PEMBOROSAN DENGAN LEAN MANUFACTURING PADA PROSES PRODUKSI DI PT. IE
Author(s) -
Ahmad Ahmad,
Helena Jk,
Andrean Yonathan
Publication year - 2021
Publication title -
prosiding seminar nasional hasil penelitian dan pengabdian kepada masyarakat
Language(s) - English
Resource type - Journals
ISSN - 2808-3199
DOI - 10.24912/psenapenmas.v0i0.15217
Subject(s) - value stream mapping , lean manufacturing , material flow , lead time , production (economics) , fault tree analysis , environmental science , quality (philosophy) , process (computing) , operations management , computer science , engineering , reliability engineering , ecology , philosophy , macroeconomics , epistemology , economics , biology , operating system
PT. IE is engaged in the business of making Lighting and Lampposts. Based on observations and interviews, there are still some wastes that arise in the flow of the production process, among which there are still many wastes of waiting time, transportation, movement and inventory. These wastes cause the product completion time to be longer and the resulting quality decreases. To eliminate or reduce waste, it is necessary to apply Lean Manufacturing. Lean Manufacturing is a systematic approach to eliminating waste and changing processes by identifying and reducing waste with continuous improvement and striving to create a production flow along the value stream by eliminating all forms of waste and increasing the added value of products to customers. From the Pareto diagram, it is found that transportation waste has the highest percentage of 26.21%, waiting time is 21.38%, motion waste is 19.31% and waste inventories are 15.17%. while the results of the Value Stream Mapping Current State Map mapping obtained a production lead time of 7,680 seconds and a total cycle time of 6,660 seconds and a PCE Current State Map value of 53.09%. Identify the root causes of waste using Fishbone diagrams, 5 Why Analysis, 5W+1H, Fault Tree Analysis and FMEA. After corrective actions have been taken, based on the Value Stream Mapping Future mapping there is a decrease in production lead time to 5,220 seconds and a decrease in total cycle time to 4,860 seconds and an increase in PCE Future State Map to 68.10% so that there is an increase of 15.01% which shows The company's production process has become more Lean.PT. IE bergerak dalam bisnis pembuatan Lighting dan Tiang Lampu. Berdasarkan observasi dan wawancara, masih terdapat beberapa pemborosan (waste) yang timbul di aliran proses produksi di antaranya masih banyak terjadi pemborosan-pemborosan waktu tunggu, transportasi, gerakan dan inventori. Pemborosan-pemborosan tersebut menyebabkan waktu penyelesaian produk menjadi lebih lama dan kualitas yang dihasilkan menurun. Untuk menghilangkan atau mengurangi pemborosan diperlukan adanya penerapan Lean Manufacturing.Lean Manufacturing merupakan pendekatan sistematik untuk mengeliminasi pemborosan dan mengubah proses dengan cara mengidentifikasi dan mengurangi pemborosan dengan perbaikan kontinu dan berupaya untuk menciptakan aliran produksi sepanjang value stream dengan menghilangkan segala bentuk pemborosan serta meningkatkan nilai tambah produk kepada pelanggan. Dari diagram Pareto ditemukan waste transportasi memiliki persentase paling tinggi sebesar 26,21%, waktu tunggu 21,38%, waste motion 19,31% dan waste inventories 15,17%. sedangkan hasil pemetaan Value Stream Mapping Current State Map diperoleh production lead time selama 7.680 detik dan total cycle time selama 6.660 detik serta nilai PCE Current State Map sebesar 53,09%. Identifikasi akar permasalahan pemborosan menggunakan diagram Fishbone, 5 Why Analysis, 5W+1H, Fault Tree Analysis dan FMEA. Setelah dilakukan tindakan–tindakan perbaikan, berdasarkan pemetaan Value Stream Mapping Future ada penurunan production lead time menjadi 5.220 detik dan penurunan total cycle time menjadi 4.860 detik serta ada peningkatan PCE Future State Map menjadi 68,10% sehingga ada peningkatan 15,01% yang menunjukan proses produksi perusahaan telah menjadi lebih Lean.