ANALISA SISTEM PENGAMAN GENERATOR PLTDG DI PT INDONESIA POWER UNIT PEMBANGKITAN BALI
Author(s) -
Putu Wira Asta Dharma,
Cok Gede Indra Partha,
Ngakan Putu Satriya Utama
Publication year - 2018
Publication title -
jurnal spektrum
Language(s) - English
Resource type - Journals
eISSN - 2302-3163
pISSN - 2684-9186
DOI - 10.24843/spektrum.2018.v05.i02.p18
Subject(s) - relay , generator (circuit theory) , diesel generator , fault (geology) , automotive engineering , power (physics) , work (physics) , diesel fuel , electric power system , electrical engineering , electric power , electric generator , unit (ring theory) , engineering , environmental science , mechanical engineering , mathematics , physics , mathematics education , quantum mechanics , seismology , geology
The need for electrical power, especially in Bali, is increasing every year. Therefore, the Bali’s Generating Unit of PT Indonesia Power has replaced the Diesel-powered Electrical Generator Pembangkit Listrik Tenaga Diesel (PLTD) with ‘the Gas-powered Diesel of Electrical Generator Pembangkit Listrik Tenaga Diesel Gas’ (PLTG). Such a replacement causes the change in the generating capacity power which affects the setting and system of protection. This current study was intended to analyze the relay protecting system using the short connecting simulation method in the ETAP program in order to be able to identify the maximum and minimum disturbing current, the working time setting and the OCR (Over Current Relay) and GFR (Ground Fault Relay) protecting coordination. Based on the result of simulation and calculation, it can be concluded that the OCR took 1.18 seconds to work, faster than the GFR, which took 2.25 seconds to work.