z-logo
open-access-imgOpen Access
MATERIAL REQUIREMENT PLANNING UNTUK MEMENUHI PRODUKSI PADA CV. BANGUN CIPTA ARTHA DI BADUNG
Author(s) -
I Made Sugita Yasa,
Kastawan Mandala
Publication year - 2020
Publication title -
e-jurnal manajemen
Language(s) - English
Resource type - Journals
ISSN - 2302-8912
DOI - 10.24843/ejmunud.2020.v09.i02.p02
Subject(s) - raw material , material requirements planning , sizing , inventory cost , total cost , inventory control , build to order , economic order quantity , operations management , computer science , mathematics , engineering , production (economics) , business , chemistry , supply chain , economics , accounting , organic chemistry , marketing , macroeconomics
Inventory management without Material Requirement systems in CV. Bangun Cipta Artha resulted in the lot size for each order of raw materials not optimal. One concept that can be used to plan and control raw materials is the Material Requirement Planning. This study is to determine the number of sizes of raw material orders, the exact order time, the method that produces the lowest cost for each raw material, and the effect of using MRP on inventory costs. This research conducted on 160x200cm spring bed products. Data was analyzed by making production master schedules, determining net requirements, determining lot size, and making MRP tables. Based on the results, the determination the best lot sizing is the order quantiy period which results in a total inventory cost of Rp. 26,475,220 where the total cost is lower, compared to lot for lot method which Rp. 43,464,000. part period balancing Rp. 33,106,576, and conventional method Rp.49,472,912. Keywords: Material Requirement Planning (MRP), Sizing Lot, Lot For Lot, Balancing Part Period, Period Order Quantiy

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here