z-logo
open-access-imgOpen Access
A bi-objective algorithm for a reactive multi-skill project scheduling problem
Author(s) -
Cheikh Dhib,
Ameur Soukhal,
Emmanuel Néron,
Hafedh Mohamed-Babou,
Bedine Kerim
Publication year - 2016
Publication title -
international journal of computer and technology
Language(s) - English
Resource type - Journals
ISSN - 2277-3061
DOI - 10.24297/ijct.v15i11.4366
Subject(s) - computer science , mathematical optimization , scheduling (production processes) , genetic algorithm , job shop scheduling , context (archaeology) , algorithm , machine learning , mathematics , schedule , paleontology , biology , operating system
The aim of this paper is to present project scheduling problem met in a an industrial context. The focus is mainly to the reactive model. In fact, the predictive case was studied in previous works, and this paper presents a solution for a reactive version of the model studied before. We proposed a linear mathematical model for the problem and then we show that this model cannot be used in practice to the solve problem. Then we present a bi-objectve genetic algorithm proposed to solve this problem. Experiment results are provided also.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here