z-logo
open-access-imgOpen Access
THE FEASIBILITY STUDY OF APPLICATION OF COMBINED CYCLE GAS TURBINE UNITS ON BOARD SHIPS OF THE RUSSIAN FLEET
Author(s) -
N. G. Rodionov,
V. V. Korotkov,
Evgeny Ivanovich Tomashov
Publication year - 2017
Publication title -
vestnik astrahanskogo gosudarstvennogo tehničeskogo universiteta. seriâ: morskaâ tehnika i tehnologiâ
Language(s) - English
Resource type - Journals
eISSN - 2225-0352
pISSN - 2073-1574
DOI - 10.24143/2073-1574-2017-4-93-99
Subject(s) - combined cycle , gas turbines , turbine , engineering , environmental science , mechanical engineering
The article studies the possibility of application combined-cycle gas turbine plants (CCGT) in the Russian Navy. A review of numerous publications allows to infer that the essential increase of ship power plant (SPP) efficiency (10-15%) can be reached by using combine-cycle gas turbine plants. It should be noted that the greatest effect on CCGT performance makes the level of technological sophistication of gas-turbine units (GTU), in particular, the gas temperature achieved before the turbine. The possibility of creating marine CCGT in Russia is being explored. The article contains examples of the use of GTUs on board foreign ships. Close attention is drawn to the advanced techniques used to increase CCGT efficiency. There have been presented calculations of the approved scheme of CCGT, which demonstrate the advantages of using CCGTs.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here