z-logo
open-access-imgOpen Access
Analysis of Production Scheduling In “Abadi” Malang Rackets And Sport Equipment Company
Author(s) -
Erika Fera Septiana,
Nurul Asfiah,
Kenny Roz
Publication year - 2021
Publication title -
jurnal manajemen bisnis dan kewirausahaan
Language(s) - English
Resource type - Journals
ISSN - 2776-1118
DOI - 10.22219/jamanika.v1i1.16013
Subject(s) - scheduling (production processes) , racket , computer science , due date , operations research , operations management , mathematics , engineering , schedule , mechanical engineering , operating system , swing
Racket and Sports Equipment Company "Abadi" Malang is engaged in manufacturing. As a result of the covid-19, the company only produces midangan. The purpose of this research is to find out and find the optimal scheduling method so that it can overcome the problem of delays in order completion. The method used is the priority rule consisting of first come first serve (FCFS), shortest processing time (SPT), longest processing time (LPT), and earliest due date (EDD). The results of the study indicate that the SPT method is a method that has the most optimal measure of effectiveness compared to the FCFS, LPT, and EDD methods. The SPT method produces an average value of 21 days of completion, 31.74% utility, an average number of jobs in the system 3.15 jobs, and a delay of 12.5 days.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here