z-logo
open-access-imgOpen Access
Cohesion between Cost, Time and Quality Performance of Civil Engineering Project: Evidence from Contractor Prequalification Criteria
Author(s) -
Akinmusire Adeleye Ola
Publication year - 2018
Publication title -
urban studies and public administration
Language(s) - English
Resource type - Journals
eISSN - 2576-1994
pISSN - 2576-1986
DOI - 10.22158/uspa.v1n2p210
Subject(s) - cohesion (chemistry) , quality (philosophy) , engineering , project management , group cohesiveness , operations management , systems engineering , psychology , social psychology , philosophy , chemistry , organic chemistry , epistemology
Setting cost, time and quality targets for civil engineering project is motivated by the need to have an instrument that would dictate and control activities of the contractor towards delivery of product that meets client’s expectations. This study, which examines the relationship between cost, time and quality performance of civil engineering project, is premised on the importance of showing whether cost, time and quality performance of civil engineering project demonstrates different correlation patterns on one part or exhibit different significance relative to contractor prequalification criteria on the other part. It uses questionnaire to obtain the needed data and analysis achieved through spearman’s rank correlation and regression methods. It establishes the nature of the cohesion between these three parameters. Consequently, both strong and weak positive relationship exists between contractor prequalification criteria and cost, time and quality performance of civil engineering project at p?1%. In spite of this, interconnectivity between these three variables is demonstrated by contractor prequalification criteria. Cohesion also exists between cost, time and quality performance of civil engineering project at p?5%. Therefore, criteria for contractor prequalification firmly bind cost, time and quality performance of civil engineering project. Also, the firmness of cost time and quality performance of civil engineering project depends of contractor prequalification criteria. Hence, client and representatives should take the cohesiveness of cost, time and quality performance into consideration when determining the choice of contractor prequalification criteria for civil engineering project.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here