z-logo
open-access-imgOpen Access
Analisa Optimasi Analisa Optimasi Diameter Jaringan Pipa Distribusi Air Bersih Dengan Menggunakan Software EPANET, LINGO di Jalur Sentul City PDAM Tirta Kahuripan Kabupaten Bogor
Author(s) -
Nuryani Nuryani,
Budi Santosa
Publication year - 2020
Publication title -
rekayasa sipil
Language(s) - English
Resource type - Journals
eISSN - 2502-6348
pISSN - 1978-5658
DOI - 10.21776/ub.rekayasasipil.2020.014.02.8
Subject(s) - clean water , piping , environmental science , computer science , engineering , environmental engineering , waste management
One of the most important roles of water system supply is piping networking. Performance of water supply sistem service is determined not only by a capacity from the source, but also by water volume which must also be up to the vertices with high flow and adequate pressure as needed. Besides, the effectiveness of a pipline is measured from the cost of investment and operational cost over life of specified order. In order to achieve adequate pressure and flow conditions it must be analyzed the size carefully. Linear programming represents the completion of operations research techniques that can solve optimization problems. Linear prograsmming is used to minimize cost size of pipe. On this research, a sample informartion taken by a clean water distributin network in PDAM Tirta Khuripan, Bogor, West Java. By using the method of linear programing the result of optimization in PDAM Tirta Khuripan, Bogor, West Java diameter Optimal with Existing diameter ᶲ0.4 m range to ᶲ (0.15-0.35) (m) for pipes with Existing diameter ᶲ 0.25 m range to ᶲ (0.2-0.23) (m) and headloss loss analysis results in numbers / values of headloss that meet the standard which ranges from (0. - 4.0) (m). The draft total cost budget for distribution network optimization using LINGO software is IDR 4.291.967.000,00.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here