Submittal of Final Post-Closure Inspection Letter Report for Corrective Action Unit 91: Area 3 U-3fi Injection Well, 2006
Author(s) -
Restoration, NSTec Environmental
Publication year - 2007
Language(s) - English
Resource type - Reports
DOI - 10.2172/926636
Subject(s) - closure (psychology) , unit (ring theory) , action (physics) , computer science , operations management , engineering , mathematics , political science , physics , law , mathematics education , quantum mechanics
This letter serves as the post-closure monitoring letter report for the above Corrective Action Unit (CAU) for calendar year 2006. CAU 91 is inspected every six months. The first inspection was conducted on March 23, 2006, and the second inspection was conducted on September 19, 2006. All access roads, fences, gates, and signs were in excellent condition. No settling, cracking, or erosion was observed on the cover, and the use restriction had been maintained. No issues were identified, and no corrective actions were needed. The post-closure inspection checklists for CAU 91 are attached. Photographs and fields notes taken during site inspections are maintained in the project files

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here