z-logo
open-access-imgOpen Access
MERCURY REMOVAL IN A NON-THERMAL, PLASMA-BASED MULTI-POLLUTANT CONTROL TECHNOLOGY FOR UTILITY BOILERS
Author(s) -
M. Loomis
Publication year - 2004
Language(s) - English
Resource type - Reports
DOI - 10.2172/834583
Subject(s) - mercury (programming language) , pollutant , environmental science , streams , process engineering , thermal , computer science , engineering , chemistry , operating system , meteorology , organic chemistry , programming language , physics
This technical report describes the results from Task 1 of the Cooperative Agreement. Powerspan has installed, tested, and validated Hg SCEMS systems for measuring oxidized and elemental mercury at the pilot facility at R.E. Burger Generating Station in Shadyside, Ohio. When operating properly, these systems are capable of providing near real-time monitoring of inlet and outlet gas flow streams and are capable of extracting samples from different locations to characterize mercury removal at these different ECO process stages. This report discusses the final configuration of the Hg CEM systems and the operating protocols that increase the reliability of the HG SCEM measurements. Documentation on the testing done to verify the operating protocols is also provided. In addition the report provides details on the protocols developed and used for measurement of mercury in process liquid streams and in captured ash

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here