z-logo
open-access-imgOpen Access
Overall Ventilation System Flow Network Calculation for Site Recommendation
Author(s) -
Jeff J. Steinhoff
Publication year - 2001
Language(s) - English
Resource type - Reports
DOI - 10.2172/789894
Subject(s) - scope (computer science) , plan (archaeology) , work (physics) , software , metric (unit) , procurement , statement of work , engineering , computer science , civil engineering , systems engineering , operations research , environmental science , database , mechanical engineering , operations management , operating system , geology , paleontology , marketing , business , programming language
The scope of this calculation is to determine ventilation system resistances, pressure drops, airflows, and operating cost estimates for the Site Recommendation (SR) design as detailed in the ''Site Recommendation Subsurface Layout'' (BSC (Bechtel SAIC Company) 2001a). The statutory limit for emplacement of waste in Yucca Mountain is 70,000 metric tons of uranium (MTU) and is considered the base case for this report. The objective is to determine the overall repository system ventilation flow network for the monitoring phase during normal operations and to provide a basis for the system description document design descriptions. Any values derived from this calculation will not be used to support construction, fabrication, or procurement. The work scope is identified in the ''Technical Work Plan for Subsurface Design Section FY01 Work Activities'' (CRWMS M&O 2001, pp. 6 and 13). In accordance with the technical work plan this calculation was prepared in accordance with AP-3.12Q, ''Calculations'' and other procedures invoked by AP-3.12Q. It also incorporates the procedure AP-SI1.Q, ''Software Management''

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here