z-logo
open-access-imgOpen Access
Engineer, design, construct, test, and evaluate a pressurized fluidized bed pilot plant using high sulfur coal for production of electric power. Phase I: preliminary engineering. Technology support test results PFB heat exchanger fin and tube materials erosion rig evaluation test period July 1976--April 1977
Publication year - 1978
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/6771184
Subject(s) - fluidization , coal , heat exchanger , fluidized bed combustion , power station , waste management , fluidized bed , combustion , heat transfer , engineering , environmental science , nuclear engineering , chemistry , mechanical engineering , thermodynamics , electrical engineering , physics , organic chemistry

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom