z-logo
open-access-imgOpen Access
Selected Detention Ponds: SH 36 from FM 2218, Fort Bend County to FM 1495, Brazoria County
Author(s) -
Joel Butler
Publication year - 2019
Publication title -
index of texas archaeology
Language(s) - English
Resource type - Journals
ISSN - 2475-9333
DOI - 10.21112/ita.2019.1.28
Subject(s) - shovel , archaeology , geography , listing (finance) , economics , finance
On behalf of CP&Y and the Texas Department of Transportation (TxDOT), AmaTerra Environmental conducted an intensive archeological survey of two of five proposed detention ponds in Brazoria and Fort Bend Counties, Texas. The detention ponds are part of TxDOT’s proposed widening of State Highway (SH) 36 from Farm to Market Road (FM) 2218 in Pleak, Fort Bend County to FM 1495 in Freeport, Brazoria County, Texas (CSJs 0187-05-050, 0188-02-029, 0188-03-019, 0188-04-035, 0188-04-025, 0188-05-027, 0188-06-046, 0111-08-100, 0187-05-048, 0188-04-044, and 0188-02-036). The project was completed in compliance with Section 106 of the National Historic Preservation Act (Section 106) and the Antiquities Code of Texas (ACT) under Permit no. 8868.Work was conducted April 17, 2019 by a team of two archeologists and consisted of visual inspection and shovel testing of two proposed pond locations (Varner Creek and Pond B). A total of 21 shovel tests were excavated and one new archeological site (41BO282) was recorded. This mid-twentieth century site, recorded in the proposed Pond B location, retains little to no data potential within the APE. It is therefore recommended not eligible for listing on the National Register of Historic Places or as a State Antiquities Landmark.Access was not available at the time of survey for proposed detention Pond A. However, it was visually inspected from the existing right-of-way (ROW) and its current use as a paved construction staging area indicates that archeological resources are unlikely to exist at the location. Therefore, no further work is recommended for this pond site.Rights of Entry (ROE) were not available at the time of survey for the remaining proposed pond locations (Big Creek 1 and Big Creek 2). AmaTerra recommends intensive archeological survey for these areas when access becomes available and prior to construction.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here