z-logo
open-access-imgOpen Access
Design the Back-Up Line of Power Supply Automatic Fireplace Building in Angkasapura II Bandung
Author(s) -
Putri Mariana,
Rahmat Hidayat
Publication year - 2022
Publication title -
jeee-u (journal of electrical and electronic engineering-umsida)/jte-u (jurnal teknik elektro universitas muhammadiyah sidoarjo)
Language(s) - English
Resource type - Journals
eISSN - 2540-8658
pISSN - 2460-9250
DOI - 10.21070/jeeeu.v6i1.1410
Subject(s) - backup , electricity , mains electricity , line (geometry) , environmental science , automotive engineering , engineering , electrical engineering , mechanical engineering , voltage , mathematics , geometry
Angkasapura II is a State-Owned Enterprise (BUMN) that serves air traffic travel using airplanes which cannot be separated from the need for electricity. Almost all services use electricity, without exception the PKP-PK Building or the fire fighting building. This is because this building has an integrated fire detector that is connected from every room throughout the Angkasapura II area directly with the PKP-PK Building or the fire department building. The problem is because the PKP-PK power source is still sourced from the TNI AU base and has not been sourced from PT Angkasa Pura II. It is feared that if the main source of PKP-PK electricity is interrupted, there will no longer be a backup power supply in the PKP-PK area. From the results of this study, a backup power supply line for the PKP-PK area was made from Angkasapura II, with this if the main electricity had problems, the area could operate smoothly because it had been backed up by the electricity supply from PLN and the Angkasapura II Genset. .

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here